單項(xiàng)選擇題()assesses the priority of identified risks using their probability of occurring, the corresponding impact on project objectives if the risks do occur, as well as other factors such as the time frame and risk tolerance of the project constraints of cost, schedule, scope, and quality.

A. Quantitative Risk Analysis
B. Qualitative Risk Analysis
C. Enterprise Environmental Factors
D. Risk Management Plan


你可能感興趣的試題

5.單項(xiàng)選擇題配置審計(jì)包括物理審計(jì)和功能審計(jì),()屬于功能審計(jì)的范疇。

A.代碼走查 
B.變更過(guò)程的規(guī)范性審核
C.介質(zhì)齊備性檢查
D.配置項(xiàng)齊全性審核 

6.單項(xiàng)選擇題某個(gè)配置項(xiàng)的版本由1.11變?yōu)?.12,按照配置版本號(hào)規(guī)則表明()。

A.目前配置項(xiàng)處于正在修改狀態(tài),配置項(xiàng)版本升級(jí)幅度較大 
B.目前配置項(xiàng)處于正在修改狀態(tài),配置項(xiàng)版本升級(jí)幅度較小 
C.目前配置項(xiàng)處于正式發(fā)布狀態(tài),配置項(xiàng)版本升級(jí)幅度較小 
D.目前配置項(xiàng)處于正式發(fā)布狀態(tài),配置項(xiàng)版本升級(jí)幅度較大

7.單項(xiàng)選擇題某軟件開發(fā)項(xiàng)目計(jì)劃設(shè)置如下基線:需求基線、設(shè)計(jì)基線、產(chǎn)品基線。在編碼階段,詳細(xì)設(shè)計(jì)文件需要變更,以下敘述中,()是正確的。

A.設(shè)計(jì)文件評(píng)審已通過(guò),直接變更即可 
B.設(shè)計(jì)基線已經(jīng)建立,不允許變更 
C.設(shè)計(jì)基線已經(jīng)建立,若變更必須走變更控制流程 
D.詳細(xì)設(shè)計(jì)與設(shè)計(jì)基線無(wú)關(guān),直接變更即可

9.單項(xiàng)選擇題在進(jìn)行()時(shí)可以采用期望貨幣值技術(shù)。

A.定量風(fēng)險(xiǎn)分析 
B.風(fēng)險(xiǎn)緊急度評(píng)估 
C.定性風(fēng)險(xiǎn)分析 
D.SWOT分析

10.單項(xiàng)選擇題企業(yè)通過(guò)多年項(xiàng)目實(shí)施經(jīng)驗(yàn)總結(jié)歸納出的IT項(xiàng)目可能出現(xiàn)的風(fēng)險(xiǎn)列表屬于()范疇。

A.企業(yè)環(huán)境因素 
B.定性分析技術(shù) 
C.組織過(guò)程資產(chǎn) 
D.風(fēng)險(xiǎn)規(guī)劃技術(shù)

最新試題