單項選擇題What is the term for the space that exists above a drop ceiling or below a raised floor and that isused for air return?()

A.NEMA area
B.plenum area
C.DAS area
D.extended area
E.RF special area


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題Where should known problem areas in the site survey be documented?()

A.nowhere (but should be discussed with the customer)
B.on the site survey map and within the site survey text
C.on the customers blueprints
D.in the Cisco WCS Planning Tool

2.單項選擇題The AirMagnet passive site survey tool can provide RF coverage data, except for which parameter?()

A.Signal strength (4th access point)
B.Signal strength (3rd access point)
C.Channel interference
D.Predictive physical data rate downlink (2nd access point)

3.單項選擇題What approximates the signal attenuation of a plasterboard wall?()

A.Crowd of people
B.Office window
C.Metal door
D.Brick wall

4.單項選擇題Which statement is true when using a Cisco Wireless Mesh Networking Solution?()

A.The backhaul link is dynamic 1 to 54Mb/s.
B.The backhaul link is typically a fixed value.
C.The backhaul link uses DAS antennas.
D.The backhaul link uses antenna multiplexing.
E.The backhaul link does not rely on fade margin.

5.單項選擇題To which parameter should the access point be set during a site survey?()

A.Transmit only
B.Diversity
C.Receive only
D.Single isolated antenna

7.單項選擇題If there is an existing 802.11g WLAN at a site, which service can be provided without conducting anew site survey?()

A.Add a new 802.11a WLAN
B.Increase the Layer 2 and Layer 3 security of the WLAN
C.Increase the throughput for the wireless clients
D.Add new services (such as voice) over the WLAN

8.多項選擇題What are two objectives of a pre-site survey walkthrough? ()

A.Identify potential problem areas
B.Define intended coverage areas
C.Access compliance with local building codes
D.Determine the final location of APs and antennas
E.Identify sources of RF signal attenuation and RF interference

9.單項選擇題Which is NOT part of a typical wireless site survey?()

A.Implementation suggestions
B.Access point locations
C.Security requirements
D.Access point mounting methods

10.單項選擇題Which value is NOT supported by Cisco Spectrum Expert, when checking for RF coverage?()

A.Access point received-signal strength level
B.Spectrum utilization
C.Client data rate
D.In-band radio frequency interference

最新試題

Which format can NOT be imported into Cisco WCS Planning Tool?()

題型:單項選擇題

Which statement regarding the site-survey process is correct?()

題型:單項選擇題

Given the correct input parameters, the Cisco WCS Planning Tool can calculate a recommendedaccess point count for which three uses? ()

題型:多項選擇題

According to the following statement, can you tell me which term is described?()It is the air return for an air conditioned system. In most buildings, the area above a drop ceiling orunder a raised floor is used as the air return (source of air) for the air conditioning. Those dropceiling and raised floors are also where wire is often installed. If wire and cable is installed in a dropceiling or raised floor, it is out of sight. If that cable were burning, it would give off toxic fumes.These would be fed to the rest of the building by the air conditioner. As a result, people could beinjured even though they are a long way from the fire.

題型:單項選擇題

When using a lightning arrestor, connect which type of ground wire to a good earth ground?()

題型:單項選擇題

Which three items does the Cisco WCS Planning Tool Generate Proposal Report provide?() 

題型:多項選擇題

Which three formats can be used to import floor maps in Cisco WCS v5.2?()

題型:多項選擇題

When conducting a wireless voice site survey, which two sizing considerations exist for thecoverage cell?()

題型:多項選擇題

Which statement about active and passive surveys is incorrect?()

題型:單項選擇題

Which three items should the site survey documentation include?()

題型:多項選擇題