You have just created a new VLAN on your network for inter-VLAN routing.  
What is one step that you should include in your VLAN-based implementation and verification plan?()

A.Verify that different native VLANs exist between two switches for security purposes.
B.Verify that the switch is configured to allow for trunking on the switch ports.
C.Verify that each switch port has the proper IP address space assigned to it for the new VLAN. 
D.Verify that the VLAN virtual interface has been correctly created and enabled.


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題

You have just created a new VLAN on your network for inter-VLAN routing. 
What is one step that you should include in your VLAN-based implementation and verification plan?()

A.Verify that different native VLANs exist between two switches for security purposes.
B.Verify that the switch is configured to allow for trunking on the switch ports.
C.Verify that each switch port has the proper IP address space assigned to it for the new VLAN. 
D.Verify that the VLAN virtual interface has been correctly created and enabled.

2.單項(xiàng)選擇題

You have just created a new VLAN on your network.
 What is one step that you should include in your VLAN-based implementation and verification plan? ()

A.Verify that trunked links are configured to allow the VLAN traffic.
B.Verify that the switch is configured to allow for trunking on the switch ports.
C.Verify that each switch port has the correct IP address space assigned to it for the new VLAN.
D.Verify that different native VLANs exist between two switches for security purposes.

3.單項(xiàng)選擇題

You have just created a new VLAN on your network.
 What is one step that  you should include in your VLAN based implementation and verification plan? ()

A.Verify that different native VLANs exist between two switches for security purposes.
B.Verify that the VLAN was added on all switches with the use of the show vlan command. 
C.Verify that the switch is configured to allow for trunking on the switch ports.
D.Verify that each switch port has the correct IP address space assigned to it for the new VLAN.

4.單項(xiàng)選擇題What is a critical piece of information that you should have when creating a VLAN-based implementation plan?()

A.approval from senior management
B.end-user requirements
C.IEEE 802.1X authentication parameters
D.a summary implementation plan

5.單項(xiàng)選擇題When you create a network implementation VLAN solution, what is one procedure that you should include in your plan?()

A.Perform an incremental implementation of components.
B.Following the PPDIOO model, implement the entire solution and then test end-to-end to make sure that it is performing as designed.
C.Implement trunking of all VLANs to ensure that traffic is crossing the network as needed before performing any pruning of VLANs.
D.Test the solution on a segmented portion of a lab network prior to rolling out across the entire network.

6.單項(xiàng)選擇題

You are planning a new VLAN-based network solution. 
What is one item you should consider when creating your implementation plan as it concerns VLANs?()

A.generic router and switch configuration parameters
B.end-to-end test plan after all components have been installed and  configured
C.administrator assignments
D.rollback plan

7.單項(xiàng)選擇題What network information do you need when you plan to implement a VLAN-based solution?()

A.default VLAN information for all unused switch ports
B.802.1x configuration parameters 
C.number of IP subnets needed
D.IP routing protocol information

9.單項(xiàng)選擇題Which Cisco IOS command globally enables port-based authentication on a switch? ()

A.aaa port-auth enable
B.radius port-control enable
C.dot1x system-auth-control
D.switchport aaa-control enable

10.單項(xiàng)選擇題What does the interface subcommand switchport voice vlan 222 indicate?()

A.The port is configured for both data and voice traffic.
B.The port is fully dedicated to forwarding voice traffic.
C.The port will operate as an FXS telephony port.
D.Voice traffic will be redirected to VLAN 222.

最新試題

Which router redundancy protocol cannot be configured for interface tracking?()

題型:?jiǎn)雾?xiàng)選擇題

Which statement is correct about RSTP port roles?()

題型:?jiǎn)雾?xiàng)選擇題

Refer to the exhibit. For what purpose is the command show ip cef used?()

題型:?jiǎn)雾?xiàng)選擇題

If G1/0/1 on DS1 is shutdown, what will be the current priority value of the Vlan105’s group on DS1 ?()

題型:?jiǎn)雾?xiàng)選擇題

Refer to the exhibit. What command was issued on the Layer 3 switch Sw1 between Exhibit #1 and Exhibit #2?()

題型:?jiǎn)雾?xiàng)選擇題

Refer to the exhibit. Initially, LinkA is connected and forwarding traffic. A new LinkB is then attached between SwitchA and HubA. Which two statements are true about the possible result of attaching the second link?()

題型:多項(xiàng)選擇題

During routine maintenance, G1/0/1 on DS1 was shutdown. All other interface were up. DS2 became the active HSRP device for Vlan101 as desired. However, after G1/0/1 on DS1 was reactivated. DS1 did not become the active HSRP device as desired. What need to be done to make the group for Vlan101 function properly ? ()

題型:?jiǎn)雾?xiàng)選擇題

What two things will occur when an edge port receives a BPDU?()

題型:多項(xiàng)選擇題

Refer to the exhibit. Switch S2 contains the default configuration. Switches S1 and S3 both have had the command spanning-tree mode rapid-pvst issued on them. What will be the result?()

題型:?jiǎn)雾?xiàng)選擇題

Refer to the exhibit. On the basis of the output of the show spanning-tree inconsistentports command, which statement about interfaces FastEthernet 0/1 and FastEthernet 0/2 is true?()

題型:?jiǎn)雾?xiàng)選擇題